Articles
Every week we talk about industry, digitalisation, economics and entrepreneurship.

The User Interface in the Agentic Era
How will the user interface change with AI agents? We explore four possible futures, from universal assistants to personalized interfaces.

SGA vs WMS: The Same Technology, Two Different Names
SGA and WMS refer to the same warehouse management software. Discover which features your warehouse needs and how to choose a solution that is easy to implement.

What Is a CMMS, and Should You Measure by Time or Usage?
A CMMS doesn’t prevent breakdowns: it prevents you from forgetting the inspections you had already decided to do. And what determines when an inspection is due is almost never a date; it’s a usage counter your plant is already tracking in another system.

Wave picking: what it is and how to implement it in your warehouse
Discover how wave picking groups orders into batches to reduce travel and synchronize preparation; a practical guide to implementing it.

Mobile interface for operators: what it should include and how to validate it on the factory floor
Design and validate a mobile interface for operators that prioritizes tasks, works with gloves, and syncs offline; includes metrics.

What Is an MRP: Why the Calculation Is the Easy Part
An MRP calculates what to buy, what to make, and when. The arithmetic fits on a napkin. What determines whether you can sign off on the plan are three pieces of data that almost no factory keeps up to date.

Barcodes in the Warehouse: A Practical Guide for Industrial SMEs
Warehouse barcodes help reduce errors, speed up inventory counts, and track batches; discover how to implement them in your SME.

Lot Traceability: Why Complying with the Law Isn’t Enough to Recall a Product
Regulations require you to know who you buy from and who you sell to. The link that actually determines a recall—what raw material lot ended up in which product lot—is one you have to build yourself.

Leave Excel Behind in 4–6 Weeks: Cloud MRP for Industrial SMEs
A guide for production managers: implement a cloud MRP in 4–6 weeks, integrate ERP/MES/WMS, measure results, and comply with GDPR.

Decide in 30 Days Whether Your Industrial SME Needs MRP or ERP
For production managers: an operational checklist, thresholds for choosing MRP, ERP, or MES, and a practical case with rapid implementation in 30 days.